The Elkhart 00008101 Nitro HD 8100HD is a severe-duty electric water cannon monitor for mining, construction and mobile water-delivery applications. It has a 2-1/2-inch FNPT inlet, 2-1/2-inch MNHT discharge and a rated maximum flow of 750 GPM.
This listing is for the monitor only. No nozzle, joystick, control module or harnesses are included. Match the complete part number and confirm the required Nitro HD system components before ordering.
Key Features
| Severe-duty design |
Designed for demanding mining and construction duty cycles |
| Flow-efficient waterway |
Fully vaned cast-aluminum waterway helps reduce turbulence |
| Electric positioning |
Permanent-magnet DC gearmotors control horizontal and vertical travel |
| Manual override |
Allows manual positioning when required for service or setup |
| Environmental protection |
Monitor motors are sealed to NEMA 4 |
Product Specifications
| Manufacturer |
Elkhart Brass |
| Manufacturer part number |
00008101 |
| Model |
Nitro HD 8100HD |
| Maximum flow |
750 GPM (2,839 LPM) |
| Maximum pressure |
250 PSI (17.2 bar) |
| Inlet |
2-1/2-inch female NPT |
| Discharge |
2-1/2-inch male NHT |
| Monitor weight |
17 lb |
Nitro HD System Compatibility
| Nozzle |
Use a compatible 2-1/2-inch NHT monitor nozzle; the 7000-EHD is the manufacturer-documented electric nozzle |
| Control module |
Nitro HD module 81824001 is required for the documented electric-control system |
| Joystick |
Nitro HD joystick 41067000 provides monitor and nozzle control |
| Harnessing |
Use the correct keyed Nitro HD monitor, module and joystick harnesses |
| Scope of supply |
Monitor only; nozzle, controls and harnesses are sold separately |
Before Ordering and Installation
| Mounting clearance |
Confirm full horizontal and vertical travel will clear all nearby equipment |
| Water connection |
Install on a compatible 2-1/2-inch male NPT connection using the manufacturer-specified sealing method |
| Electrical system |
Match the complete Nitro HD control system and follow the current wiring instructions |
| Hydraulic limits |
Do not exceed the rated flow or pressure; open water valves slowly to reduce water-hammer risk |
| Commissioning |
Verify secure mounting, correct travel limits, unobstructed movement and leak-free operation before service |