The Elkhart Brass 81340001 is a surface-mount secondary control box for compatible Scorpion 8294-04 electric monitor systems. Separate sealed toggle switches provide up-down, left-right, and straight-stream-to-fog control.
The NEMA 4 enclosure includes an internal terminal strip for control-cable connections and a watertight strain-relief fitting at the cable entry. Confirm the monitor model, relay-control configuration, mounting location, and wiring requirements before installation.
Key Features
| Secondary Monitor Control |
Provides an additional operator-control position |
| Sealed Toggle Switches |
Separate controls for monitor and nozzle functions |
| Surface-Mount Enclosure |
Mounts to a compatible panel or bracket |
| NEMA 4 Rating |
Enclosure is designed for demanding apparatus environments |
| Internal Terminal Strip |
Provides control-cable connection points |
| Watertight Cable Entry |
Strain-relief fitting seals around the incoming cable |
Product Specifications
| Manufacturer |
Elkhart Brass |
| Manufacturer Part Number |
81340001 |
| Product Type |
Secondary toggle control box |
| Mounting Style |
Surface mount |
| Environmental Rating |
NEMA 4 |
| Primary Application |
Scorpion 8294-04 electric monitor |
| Cable Interface |
Internal terminal strip |
| Product Weight |
1.25 lb. |
| Store SKU |
0012021 |
Control Functions
| Up-Down |
Controls vertical monitor movement |
| Left-Right |
Controls horizontal monitor movement |
| Straight-Fog |
Controls the compatible electric nozzle pattern |
| Secondary Station |
Adds another control location to the configured system |
| Aerial Application |
May be installed at the top of a ladder in compatible systems |
| Deck-Gun Application |
May serve as a secondary controller |
Selection and Installation Checks
| Part Number |
Match Elkhart 81340001 |
| Monitor Model |
Confirm Scorpion 8294-04 compatibility |
| Controller Role |
Verify that a secondary control box is required |
| Relay Module |
Confirm compatibility with the installed relay-control module |
| Control Cable |
Verify the required nine-conductor cable and routing |
| Terminal Wiring |
Follow the specified wire-color and terminal assignments |
| Cable Entry |
Tighten the strain-relief fitting around the cable jacket |
| Enclosure Seal |
Keep the lid gasket clean and undamaged |
| Modification |
Do not modify the enclosure in a way that compromises its NEMA 4 rating |
| Function Test |
Check every control direction after installation |