Elkhart 07000804 750 GPM Nitro HD Nozzle — UnitedBuilt Equipment Skip to content
Quality Water Truck Systems, Tanks & Parts Since 1947
Quality Water Truck Systems, Tanks & Parts Since 1947

Elkhart 07000804 7000-EHD 750 GPM Nitro HD Electric Nozzle

SKU 0010024
Availability:
0 in stock. Available on backorder
Save 25% Save 25%
Original price $3,013.00
Original price $3,013.00 - Original price $3,013.00
Original price $3,013.00
Current price $2,267.00
$2,267.00 - $2,267.00
Current price $2,267.00

Product Images

Images are for representation only and may differ from the actual product.

The Elkhart Brass 07000804 is the 750 GPM version of the 7000-EHD electric nozzle for the Nitro HD system. Elkhart rates the fixed-flow configuration at 750 GPM at 100 PSI nozzle-base pressure and provides electric straight-stream-to-fog adjustment.

The nozzle connects to the Nitro HD monitor's 2-1/2-inch male NHT discharge. Confirm hydraulic capacity, electrical control compatibility, clearances, and the exact part number before installation.

Key Features

Feature Details
Exact configuration Elkhart 07000804
Rated flow 750 GPM at 100 PSI
Pattern control Electric straight stream to full fog
Inlet connection 2-1/2-inch female NHT swivel

Product Specifications

Specification Value
Manufacturer Elkhart Brass
Model 7000-EHD
Part number 07000804
Flow stem 65549307
Actuator 12 VDC actuator listed in nozzle assembly
Store SKU 0010024

System Compatibility

Component Requirement
Monitor Nitro HD 8100HD with 2-1/2-inch male NHT discharge
Control Compatible Nitro HD joystick and module
Electrical connection Mate the nozzle Deutsch connector to the monitor connector
Hydraulics System sized for 750 GPM at 100 PSI nozzle-base pressure

Installation and Safety Checks

Check Guidance
Gasket Confirm the swivel gasket is installed
Orientation Position actuator on top before tightening
Connection Hand-tighten, then use the specified spanner method
Power Disconnect power while making electrical connections
Water supply Open valves slowly to reduce water-hammer risk
Clearance Keep personnel clear of the stream path and moving equipment
Function test Verify stream/fog travel and leak-free operation