Tête de tige, 750 GPM, 100 PSI, buse 7000-EHD, Elkhart 65549307 - UnitedBuilt Equipment Passer au contenu
Pièces de camion-citerne : en stock, qualité supérieure, expédition en 1 jour ! Commandez avant 14h00 MST.
Pièces de camion-citerne : en stock, qualité supérieure, expédition en 1 jour ! Commandez avant 14h00 MST.

Tête de tige, 750 GPM, 100 PSI, buse 7000-EHD, Elkhart 65549307

UGC 0011220
Disponibilité:
0 in stock. En stock
Économisez 19% Économisez 19%
Prix d'origine $665.00
Prix d'origine $665.00 - Prix d'origine $665.00
Prix d'origine $665.00
Prix actuel $539.00
$539.00 - $539.00
Prix actuel $539.00

Images du produit

Les images sont uniquement à titre de représentation et peuvent différer du produit réel.

The Elkhart 65549307 is the 750 GPM fixed stem head for the Nitro HD 7000-EHD electric nozzle. Elkhart identifies this exact stem for a rated flow of 750 GPM at 100 PSI nozzle base pressure.

Use this component only in the compatible 7000-EHD nozzle assembly. Changing the stem alters the nozzle’s flow profile, so the pump, monitor and piping must support the selected flow safely.

Key Features

Exact flow configuration 750 GPM at 100 PSI nozzle base pressure
Field-service component Allows a compatible 7000-EHD nozzle to be configured for the documented 750 GPM profile
Exact identification Elkhart part 65549307
Manufacturer-documented fit Specified in the 7000-EHD parts drawing and Nitro HD manual

Product Specifications

Manufacturer Elkhart Brass
Manufacturer part number 65549307
Component Fixed nozzle stem head
Compatible nozzle 7000-EHD
Rated flow 750 GPM
Nozzle base pressure 100 PSI

Stem Selection

65549307 750 GPM at 100 PSI
Other 7000-EHD stems Use only the exact Elkhart stem specified for the desired 200, 350 or 500 GPM profile
Nozzle assembly This is a replacement/configuration component, not a complete nozzle
System capacity Confirm the monitor, pump and waterway can support the selected 750 GPM flow

Installation and Service Checks

Depressurize Shut down the pump, isolate the water supply and relieve pressure before nozzle service
Disconnect power Disconnect electrical power to the nozzle before replacing the stem
O-ring Confirm an AS568-012 O-ring is installed in the groove on the threaded end of the stem
Thread locking Follow the current Elkhart manual for the specified thread-locking compounds and tightening procedure
Flow check Verify stream quality and rated performance after reassembly; incorrect stream-shaper position can alter flow